55 lines
2.0 KiB
Markdown
55 lines
2.0 KiB
Markdown
# Phase 1
|
|
|
|
## Purpose
|
|
|
|
Phase 1 defines the technical decision-making framework that must be completed before implementation begins. This phase is about making and documenting core technical choices in a clear order so future work follows shared decisions rather than assumptions.
|
|
|
|
## Scope
|
|
|
|
Phase 1 establishes how technical and architectural decisions will be recorded, reviewed, and used to guide later implementation tasks.
|
|
|
|
## In Scope
|
|
|
|
- defining the major technical decisions required before implementation
|
|
- documenting architecture decisions in a durable repository-owned form
|
|
- establishing the relationship between architecture overview documents and ADRs
|
|
- clarifying the minimum decision set required before implementation starts
|
|
|
|
## Out of Scope
|
|
|
|
Until the phase-1 decision framework is complete, do not:
|
|
- start application implementation
|
|
- introduce runtime services
|
|
- choose implementation details that depend on unresolved architecture decisions
|
|
- expand into feature delivery work
|
|
- treat undocumented assumptions as approved decisions
|
|
|
|
## Expected Outputs
|
|
|
|
Phase 1 should produce:
|
|
- a maintained phase-1 decision plan
|
|
- a documented technical decision process
|
|
- a central architecture overview document
|
|
- a set of ADRs covering major technical choices
|
|
- clear implementation preconditions for the next phase
|
|
|
|
## Decision Order
|
|
|
|
Make decisions in this order:
|
|
|
|
1. Define the required decision areas.
|
|
2. Record the technical decision process and evaluation criteria.
|
|
3. Record the ADR process and naming conventions.
|
|
4. Establish the architecture overview and its relationship to ADRs.
|
|
5. Document major technical decisions in ADRs.
|
|
6. Confirm that implementation-critical choices are explicit and aligned.
|
|
|
|
## Exit Criteria for Phase 1
|
|
|
|
Phase 1 is complete when:
|
|
- the decision framework is documented
|
|
- the technical decision process is documented and usable
|
|
- the architecture overview exists and points to ADRs
|
|
- required major technical decisions are recorded as ADRs
|
|
- implementation can begin without relying on undocumented assumptions
|